QuickQuote
Roofing

Roofing Quotation Template

Free roofing quotation template with a working editor, live totals and PDF, Word or Excel downloads.

Roofing quotes need access costs visible. Scaffolding often costs more than the repair, and hiding it in a lump sum makes the quote look expensive for the wrong reason.

Step 1 · The basics

Who is this quotation for?

Autosaves as you type
Business details, address and tax information
Tax, website and legal details
Client details
Issue date, validity and referenceQQ-TPL-ROOFING

Step 2 · The work

What are you quoting?

Line 1
More line details
Line discount
Line 2
More line details
Line discount
Line 3
More line details
Line discount
Line 4
More line details
Line discount

Step 3 · Totals and terms

Adjustments, terms and branding

Optional. Your lines already make a valid quotation, so open a block only when this deal needs it.

Discounts, fees and taxNone
Fees (shipping, setup, delivery)
Terms, payment instructions and notes
Logo, colours and footer

Logo

Add or replace it directly in the document preview. PNG or JPG, up to 330 KB.

Preview the quotation
PageA4 · 210 × 297 mm

Northwind Studio

Northwind Studio LLC

18 Mission Street, Suite 400, San Francisco, CA 94105 hello@northwind.studio +1 415 555 0132 northwind.studio

Tax / VAT: US-4821-9930

Quotation

QQ-TPL-ROOFING

Issued Nov 7, 2026

Valid until Nov 21, 2026

Bill to

Acme Ltd

1200 Market Street, Floor 9, San Francisco, CA 94102 maya@acme.test Tax ID: ACME-9

Project

Roofing Quotation

USD

Scaffolding, four weeks$1,650.00

1 job × $1,650.00 · tax 0%

Strip and dispose of existing covering$588.00

42 m2 × $14.00 · tax 0%

Tiles, battens and underlay$2,016.00

42 m2 × $48.00 · tax 0%

Labour$2,040.00

6 day × $340.00 · tax 0%

Scope of work

Replacement of failed tiles and battens on the rear slope, approximately 42 square metres, with new underlay and ridge repointing.

Items (excl. tax)$6,294.00
Total$6,294.00

Payment terms

50% on order, balance on completion.

Notes

Excludes replacement of guttering and downpipes unless listed.

Terms and conditions

Price includes scaffolding for four weeks. Additional work required after the roof is opened is priced at the day rate and agreed before proceeding. Ten-year workmanship warranty.

Northwind Studio LLC · 18 Mission Street, San Francisco · hello@northwind.studio

Total

$6,294.00

Blank template downloads

The blank version contains this template's row structure, units and terms with no figures. Use it to print and fill by hand, or to keep a master copy in Word. Your finished document is exported from the generator above, so the two are never confused.

Example total in this preview: $6,294.00 across 4 lines.

Go straight to the generator

Prefer to start empty? Open the general quotation generator and build the document from scratch.

Who this template suits

Suits roofing contractors quoting repairs, replacements, flat roofs and gutter work.

What to include

  • Access: scaffolding, towers or ladders, priced as its own line.
  • Materials by area or by item, with the membrane or tile type named.
  • Labour, including the number of operatives and days.
  • What happens if hidden damage is found once the roof is open.

How to complete it

  1. Step 1

    Inspect and photograph the roof, noting the area and access.

  2. Step 2

    Separate access, materials and labour.

  3. Step 3

    State the warranty and how unexpected rot or damage is handled.

Before you send

Pricing, pitfalls and proof

  • How it is pricedSeparate access equipment, materials by area and labour by day; access is often the largest line.
  • Common mistakeAbsorbing scaffolding into the labour rate, which makes the day rate look unreasonable.
  • Keep as evidenceKeep the inspection photos, the measured area and the agreed procedure for hidden damage.

Questions about this template

Should scaffolding be a separate line?

Yes. It is a large, non-negotiable cost that the client will see quoted elsewhere. Showing it builds trust and makes like-for-like comparison possible.

How do I handle hidden damage?

Quote the visible scope, then state that additional work is priced at the stated day rate and agreed in writing before it proceeds.

What warranty should I state?

State the workmanship period and the manufacturer's material warranty separately. They are rarely the same length.

Can I quote a repair and a replacement together?

Yes. Offer the repair as the primary price and the replacement as an option, clearly labelled, so the client understands the trade-off.