QuickQuote
Construction

Construction Quotation Template

Free construction quotation template with a working editor, live totals and PDF, Word or Excel downloads.

A construction quotation has to price labour and materials separately, name what is excluded, and survive a client comparing three builders. This template starts with those sections in place.

Step 1 · The basics

Who is this quotation for?

Autosaves as you type
Business details, address and tax information
Tax, website and legal details
Client details
Issue date, validity and referenceQQ-TPL-CONSTRUCTION

Step 2 · The work

What are you quoting?

Line 1
More line details
Line discount
Line 2
More line details
Line discount
Line 3
More line details
Line discount
Line 4
More line details
Line discount
Line 5
More line details
Line discount

Step 3 · Totals and terms

Adjustments, terms and branding

Optional. Your lines already make a valid quotation, so open a block only when this deal needs it.

Discounts, fees and taxNone
Fees (shipping, setup, delivery)
Terms, payment instructions and notes
Logo, colours and footer

Logo

Add or replace it directly in the document preview. PNG or JPG, up to 330 KB.

Preview the quotation
PageA4 · 210 × 297 mm

Northwind Studio

Northwind Studio LLC

18 Mission Street, Suite 400, San Francisco, CA 94105 hello@northwind.studio +1 415 555 0132 northwind.studio

Tax / VAT: US-4821-9930

Quotation

QQ-TPL-CONSTRUCTION

Issued Nov 7, 2026

Valid until Nov 21, 2026

Bill to

Acme Ltd

1200 Market Street, Floor 9, San Francisco, CA 94102 maya@acme.test Tax ID: ACME-9

Project

Construction Quotation

USD

Site setup and protection$850.00

1 job × $850.00 · tax 0%

Strip out and waste removal$1,450.00

1 job × $1,450.00 · tax 0%

Partitions and first fix labour$3,840.00

12 day × $320.00 · tax 0%

Materials package$4,800.00

1 lot × $4,800.00 · tax 0%

Plastering and decoration$2,400.00

8 day × $300.00 · tax 0%

Scope of work

Strip out and refurbishment of the ground floor as per drawing 24-118, including partitions, first fix, plastering and decoration.

Items (excl. tax)$13,340.00
Total$13,340.00

Payment terms

20% on order, 40% at first fix, balance on practical completion.

Notes

Excludes building control fees, structural engineer and client-supplied sanitaryware.

Terms and conditions

Quotation based on the drawings and specification supplied. Variations are priced at the rates below and confirmed in writing before work starts. Access, power and welfare facilities to be provided by the client.

Northwind Studio LLC · 18 Mission Street, San Francisco · hello@northwind.studio

Total

$13,340.00

Blank template downloads

The blank version contains this template's row structure, units and terms with no figures. Use it to print and fill by hand, or to keep a master copy in Word. Your finished document is exported from the generator above, so the two are never confused.

Example total in this preview: $13,340.00 across 5 lines.

Go straight to the generator

Prefer to start empty? Open the general quotation generator and build the document from scratch.

Who this template suits

Suits builders, main contractors and site managers quoting a defined package of work rather than an open-ended estimate.

What to include

  • Labour priced by trade or day rate, with the number of days stated.
  • Materials as a separate line so the client can see what is supplied.
  • Preliminaries such as site setup, waste removal and access equipment.
  • Exclusions naming work, permits and utilities that are not included.

How to complete it

  1. Step 1

    Describe the package and reference the drawings or specification.

  2. Step 2

    Split labour, materials and preliminaries into separate lines.

  3. Step 3

    State the programme, payment stages and what happens if variations arise.

Before you send

Pricing, pitfalls and proof

  • How it is pricedPrice labour by trade or day, materials at cost plus a stated margin, and preliminaries separately.
  • Common mistakeHiding scaffolding or waste removal inside a lump sum, which clients read as an inflated labour rate.
  • Keep as evidenceKeep the drawing revision, the site visit date and every written variation with the quote.

Questions about this template

Should materials be one line or itemised?

Itemise anything the client is likely to compare or supply themselves. A single materials line hides the reason for the price and invites renegotiation.

How do I price variations?

Quote the package as drawn, then state that changes are priced separately at the same rates. The template carries that sentence in its terms.

Is a construction quotation the same as an estimate?

No. An estimate is an approximate price before the scope is fixed. A quotation is a fixed offer against defined work, which is what this template produces.

Can I add a payment schedule?

Yes. Use the payment terms section to set stage payments, for example deposit on order, a stage payment at first fix and the balance on completion.